I would say (to my surprise) it is not bad as I was expected.

Last 3 months it was communication – now I believe we have good antenna (CTO even insists to get patent), for ground station sorted out questions with mold creation – it is combined technology with dissolvable mold and alumini parts (takes a lot of time to make 3D printer working but now it saved a lot of time in design), amplifiers starts to give a promising gain. Temperature stabilization for a craft and satellite – study was done – problems and solutions for electronics temperature control was outlined. Stepper motors modes was also done study – there some promising development with precisions in antenna’s orientation. Everything ready for debugging algorithms on inclination table (simulation moon gravity).

On a business front there is interesting development – we made attempt to push for Canadian microsatellite launcher – our proposals/ ideas was in a form of special letter for Canadian Space Agency. Now we are working on a signing process from supporting business. Nothing is visible now but…

Problems not resolved et – power station, solar panels, With power it is hard – without experiments on an orbit with Cubesat everything is in a fog.

Video – not much - we have may be 15-20 min video for communication tests – raw video – may be next month we can make video with frame (rover/ground station) creation and wheels testing on inclination table.

Comments powered by RealTidBits and Echo